Built around your responsibilities
Who We Serve
Owners, contractors, facility teams and designers need different answers. We bring the scope, documentation and field coordination each role needs.
Partnership 01
Owners & Developers
Make the flooring decision with the full project in view: service life, operating demands, construction schedule and long-term upkeep.
- System recommendations matched to traffic, chemical exposure and appearance.
- Clear scope, phasing and cure windows before work begins.
- Multi-year and multi-site programs with documented closeout for each phase.
Partnership 02
General Contractors
A defined flooring scope, coordinated submittals and an installation plan that fits the construction schedule.
- Spec sections we bid: Div 09 67 (fluid-applied flooring), 03 35 43 (polished concrete), 07 18 (traffic coatings), and 07 92 (joint sealants/fillers).
- Submittal package with product data, system build-up, thickness, cure requirements and phasing.
- Moisture testing and substrate review before installation.
- Night/weekend crews coordinated around access, adjacent trades and turnover.
- $5M bonding capacity and written Safety & Health Program LIC-SAF-001.
- Full bid within 24 hours of receiving plans; photo documentation through closeout.
Partnership 03
End Users / Facility Teams
Your floor has to support the operation—not become another interruption. We plan around how your facility actually runs.
- Site walk within 1–3 business days to review traffic, cleaning, wear and failure areas.
- Phased work and after-hours installation coordinated with production and access.
- Clear return-to-service requirements, maintenance guidance and repair planning.
- Floor markings and coating work coordinated in one scope where practical.
Partnership 04
Architects & Specifiers
Turn the design intent into a buildable flooring assembly with a documented basis for product selection and preparation.
- Install to the basis-of-design product or approved equal.
- Product data sheets and submittals describing build-up, thickness and cure requirements.
- Mockups to review appearance, texture and installation details.
- ASTM testing documentation, including moisture testing and pull-off adhesion on mockups.
- Concrete surface profile matched to the specified system using ICRI 310.2R guidance.