
Commercial epoxy flooring, industrial floor coatings and polished concrete for Frisco warehouses, manufacturing plants, retail, restaurants and healthcare facilities, installed by crews from our Plano office.
Frisco
Frisco's corporate relocations and constant new commercial construction make it one of our busiest markets. We coat retail, restaurant and medical-office floors around The Star, Frisco Station and Stonebriar, and install industrial epoxy and polished concrete in warehouses and corporate buildings along the Dallas North Tollway.
We coat retail, restaurant, and medical-office floors across The Star, Frisco Station, and Stonebriar, and run industrial epoxy and polished concrete systems for warehouses and corporate campuses along the Dallas North Tollway. Frisco's pace demands fast turn-times — we mobilize quickly and work overnight to hit tenant-improvement schedules.
Services
Every floor starts with testing the slab. From there we recommend the system that fits how the space is used, built on spec-grade, manufacturer-warranted materials.
Facilities
Why Legacy
Projects
See the problem, the system we chose and the result on recent commercial floors across DFW.
All commercial case studiesFAQ
Yes. Frisco TI schedules are fast, so we mobilize quickly, work overnight and choose fast-cure systems when a space has to open on a fixed date.
Kitchens usually get urethane cement with integral cove for heat, grease and washdown. Dining rooms often get polished concrete or a decorative flake or quartz floor.
Yes. On new slabs we coordinate with the GC on cure time, moisture testing and sequencing so the floor goes down at the right point in the schedule.
Yes. Our commercial crews routinely run nights and weekends across Frisco to keep tenants and operations running. We schedule pours around your business hours, stage materials off-site, and coordinate directly with the GC or facility manager.
It depends on the slab and the operation. Polished concrete works well on a sound slab with forklift traffic; industrial epoxy or urethane cement makes sense where you need chemical resistance, a sealed surface or color-coded zones. We test the slab in Frisco before recommending a system.
For most Frisco commercial and industrial projects we walk the site within 1–3 business days and return a full bid within 24 hours of receiving plans, with the system, thickness and phasing spelled out. If you're bidding to a GC with a tight deadline, flag the due date.
Send drawings or a scope. Site walk within 1–3 business days; full bid within 24 hours of receiving plans.
Tell us about your project and we'll follow up within one business day.
Prefer to talk now? Call (214) 305-6516 or