
Floors for barns, processing rooms and ag support buildings that see water, organic residue, chemicals and equipment every day.
Agricultural buildings mix wet cleaning, feed and organic residue, stored chemicals and equipment traffic, often under one roof. Bare concrete soaks all of it up, and ordinary commercial coatings tend to peel once hot water and sanitizers get involved.
We sort the building by use. Wet handling rooms, dry storage, chemical mixing and packing areas each get the floor that fits. Every job starts with moisture testing and diamond grinding so the coating bonds to sound concrete, and we schedule around your production and harvest cycles.
Legacy Industrial Coatings installs commercial and industrial epoxy flooring, polished concrete and floor coatings from Plano, Texas, across Dallas–Fort Worth, all of Texas and nationwide. See our commercial and industrial epoxy flooring and polished concrete pages.
Serving Dallas, Fort Worth, Plano, Frisco, McKinney, Richardson, Carrollton, Lewisville and the rest of North Texas, plus Houston, Austin, San Antonio and projects across Texas and nationwide.
Floors We Install Here
Urethane cement that stands up to hot washdown, sanitizers and temperature swings, sloped and detailed at the drains.
Sealed and densified concrete that stops dusting and cleans easily, with no coating to wear off.
Chemical-resistant linings with curbs that keep fertilizers, pesticides and cleaners contained and out of the slab.
Quartz broadcast epoxy for a seamless, lightly textured surface that is easy to sanitize.
Integral cove base that carries the floor up the wall, so there are no corners to trap water and debris.


FAQ
Urethane cement is usually the starting point because it handles hot water, cold slabs and harsh cleaners better than standard epoxy. We confirm the water temperature, cleaning chemicals and drainage on the site walk before we recommend a system.
Often, yes. We can rebuild low spots and add slope toward the drains before the finish goes down. A coating alone will not move water, so we look at drains and slope first and include that work in the bid when it is needed.
Yes. We phase the work room by room, run night and weekend crews when needed, and plan around harvest or processing peaks so the facility keeps running while each area is finished.
The size of each area, the condition of the slab, how much slope or repair work is needed, and which system each room calls for. Wet rooms with drains and cove base cost more than dry storage. Send us your plans for a full bid within 24 hours, or request a site walk within 1 to 3 business days.
Send plans or a scope. Site walk within 1–3 business days; full bid within 24 hours of receiving plans.
Tell us about your project and we'll follow up within one business day.
Prefer to talk now? Call (214) 305-6516 or