
Clean, durable floors for pharmaceutical and medical manufacturing, chosen room by room to fit your process and cleaning routine.
A dry warehouse corridor, a production suite and a chemical cleaning room need different floors. We start with what each room does and how it is cleaned, then recommend the simplest floor that does the job.
Dry areas are often best as polished concrete. Production rooms usually call for a seamless quartz or epoxy floor with a chemical-resistant topcoat and cove base. We work overnight and on weekends so production keeps running.
Legacy Industrial Coatings installs commercial and industrial epoxy flooring, polished concrete and floor coatings from Plano, Texas, across Dallas–Fort Worth, all of Texas and nationwide. See our commercial and industrial epoxy flooring and polished concrete pages.
Serving Dallas, Fort Worth, Plano, Frisco, McKinney, Richardson, Carrollton, Lewisville and the rest of North Texas, plus Houston, Austin, San Antonio and projects across Texas and nationwide.
Floors We Install Here
Polished concrete that is dustproof, bright and easy to maintain.
Seamless quartz or epoxy with a chemical-resistant urethane topcoat that stands up to frequent cleaning.
Chemical-resistant resin floors chosen for the products you use.
Crack and divot repair so the finished floor is smooth and sound.
Integral cove base and clean transitions between rooms.


Our Work

Supplement Manufacturing · Dallas, TX
A supplement manufacturer in Dallas had a bare, stained concrete floor in its production wash room. We prepared the slab and installed a seamless epoxy floor that is bright, easy to clean and built for daily wet cleaning.
Read the case study
Pharmaceutical Manufacturing Plant · Dallas, TX
A 40-year-old pharmaceutical facility with badly cracked, undulating concrete needed a true high-gloss polish across 21,000 square feet — and zero production downtime. We worked overnight for four nights, filled every crack and divot with polyurea, and delivered an 800-grit polished slab the day shift never saw being built.
Read the case studyTrusted By










And more — pharmaceutical manufacturers, GCs and property managers across DFW and nationwide.
FAQ
We review your cleaning chemicals and procedures and choose a system that holds up to them. Room classification and validation stay with your team, and we provide the product information you need for that process.
Yes. We phase the work and use overnight and weekend shifts so your lines keep running. Each room is released back to your team once it has cured, and the schedule is agreed with operations before we start.
Polished concrete works well in dry areas and costs less to maintain. Production rooms that need a seamless surface and cove base usually get quartz or epoxy. Many facilities use both, and we help you draw the line between them on the site walk.
Room sizes, the system each room needs, slab repairs, cove base, and scheduling. Send us your plans for a full bid within 24 hours, or request a site walk within 1 to 3 business days.
Send plans or a scope. Site walk within 1–3 business days; full bid within 24 hours of receiving plans.
Tell us about your project and we'll follow up within one business day.
Prefer to talk now? Call (214) 305-6516 or