MMA flooring is a fast-curing acrylic resin floor that goes back into service the same day. It is the answer when a kitchen, plant or facility can only close overnight or for a weekend.
MMA (methyl methacrylate) cures in about an hour per coat, even in cold rooms, so a whole floor can go down in one overnight or weekend shutdown. It is seamless, waterproof and UV stable for indoor or outdoor use.
MMA has a strong odor while it cures, so we plan ventilation and schedule the work inside your shutdown window. In many kitchens it can go over existing quarry tile after prep, which avoids demolition. Matching cove base finishes the room.
Legacy Industrial Coatings installs commercial and industrial epoxy flooring, polished concrete and floor coatings from Plano, Texas, across Dallas–Fort Worth, all of Texas and nationwide. See our commercial and industrial epoxy flooring and polished concrete pages.
Serving Dallas, Fort Worth, Plano, Frisco, McKinney, Richardson, Carrollton, Lewisville and the rest of North Texas, plus Houston, Austin, San Antonio and projects across Texas and nationwide.
Each coat cures fast, so the floor is installed and reopened inside a short shutdown.
MMA cures in coolers and cold rooms where other resins slow down.
In many kitchens we can prep and coat existing quarry tile instead of tearing it out.
A non-porous floor with no grout lines, easy to clean and no waxing needed.
Solid, flake and quartz cove bases carry the floor up the wall.


Trusted By










And more — pharmaceutical manufacturers, GCs and property managers across DFW and nationwide.
FAQ
Each coat cures in about an hour, so the whole floor can be installed in one overnight or weekend shutdown. Exact return-to-traffic timing depends on the system and room temperature, and we confirm it before the work is scheduled.
Yes, it has a strong odor while curing. We plan ventilation, isolate the work area and schedule the install inside your shutdown window so staff and customers are not affected.
Often, yes. After prep, MMA can bond over sound quarry tile, which saves demolition time in many commercial kitchens. We check the tile and grout condition on the site walk.
Commercial kitchens, food and beverage plants, pharmaceutical spaces, hotels, data centers and any facility that cannot afford days of downtime. It works indoors and outdoors. If your shutdown window is short, MMA is usually the first system we look at.
It depends on square footage, whether tile or old coatings come out, slab repairs, cove base, texture and the size of your shutdown window. We return a full bid within 24 hours of receiving plans, so send yours or request a site walk.
Send plans or a scope. Site walk within 1–3 business days; full bid within 24 hours of receiving plans.
Tell us about your project and we'll follow up within one business day.
Prefer to talk now? Call (214) 305-6516 or