Polished concrete floor installed by Legacy Industrial Coatings in a Dallas pharmaceutical manufacturing plant

Commercial Epoxy Flooring & Polished Concrete in Sherman, TX

Commercial epoxy flooring, industrial floor coatings and polished concrete for Sherman warehouses, manufacturing plants, retail, restaurants and healthcare facilities, installed by crews from our Plano office.

3,600+
Jobs Completed
201+
Five-Star Reviews
100M+
Square Feet Installed
1K–1M+ SF
Project Range

Sherman

Commercial Flooring Company in Sherman

Sherman is a fast-growing North Texas industrial market — Texas Instruments, Globitech, GlobalWafers, and a growing semiconductor manufacturing base have driven serious demand for industrial flooring.

Anti-static / ESD epoxy, urethane cement, and FF/FL-flat polished concrete for Sherman's semiconductor and advanced manufacturing facilities, plus retail and restaurant TI work for the commercial buildout supporting the workforce.

Sherman projects are run by the same crews that handle commercial epoxy flooring in Plano, mobilizing from our Plano office.

Why Legacy

Why Sherman GCs & Facility Managers Call Us

  • Testing first: moisture and surface-profile testing before a system is chosen
  • Night, weekend and phased work in occupied buildings
  • Diamond grinding, shot blasting, crack and joint repair
  • General liability and workers' comp on every job; OSHA-compliant crews
  • Spec-grade, manufacturer-warranted Legacy systems, installed to the basis of design
  • Site walk within 1–3 business days; full bid within 24 hours of receiving plans

FAQ

Sherman Commercial Flooring Questions

Do you handle commercial coatings in Sherman after hours or on weekends?

Yes. Our commercial crews routinely run nights and weekends across Sherman to keep tenants and operations running. We schedule pours around your business hours, stage materials off-site, and coordinate directly with the GC or facility manager.

What floor coating do you recommend for a Sherman warehouse?

It depends on the slab and the operation. Polished concrete works well on a sound slab with forklift traffic; industrial epoxy or urethane cement makes sense where you need chemical resistance, a sealed surface or color-coded zones. We test the slab in Sherman before recommending a system.

What's the lead time for a commercial bid in Sherman?

For most Sherman commercial and industrial projects we walk the site within 1–3 business days and return a full bid within 24 hours of receiving plans, with the system, thickness and phasing spelled out. If you're bidding to a GC with a tight deadline, flag the due date.

Get a bid on your Sherman project

Send drawings or a scope. Site walk within 1–3 business days; full bid within 24 hours of receiving plans.

Request Information

Tell us about your project and we'll follow up within one business day.

Prefer to talk now? Call (214) 305-6516 or

PDF, images, CAD, ZIP, Word or Excel · Up to 10 files · 25 MB each