
Broken joint edges and cracked concrete beat up forklifts, trap debris and get worse every day. We repair the damage and fill the joints so wheels roll smoothly again.
Control joints in a warehouse slab are weak spots under hard wheels. Left open, the edges chip and spall until carts and forklifts bang across every one. Filling joints with a semi-rigid polyurea supports those edges, and we shave it flush for a smooth ride.
Cracks, divots and spalls each need their own fix. We remove loose concrete, rebuild the profile and separate stable cracks from ones that still move and need a flexible detail. Repairs can stand alone or come with a new coating or polish.
Legacy Industrial Coatings installs commercial and industrial epoxy flooring, polished concrete and floor coatings from Plano, Texas, across Dallas–Fort Worth, all of Texas and nationwide. See our commercial and industrial epoxy flooring and polished concrete pages.
Serving Dallas, Fort Worth, Plano, Frisco, McKinney, Richardson, Carrollton, Lewisville and the rest of North Texas, plus Houston, Austin, San Antonio and projects across Texas and nationwide.
Semi-rigid polyurea supports joint edges under forklift traffic and is shaved flush with the floor.
Chipped and broken joint edges are cut back and rebuilt so the filler has solid concrete to hold.
Cracks and surface pits are filled and leveled so they stop catching wheels and collecting dirt.
Joints that move get a flexible sealant, not a rigid fill that will crack loose.
Night, weekend and phased work keeps aisles open while we repair.


Trusted By










And more — pharmaceutical manufacturers, GCs and property managers across DFW and nationwide.
FAQ
No. Semi-rigid filler supports traffic-bearing joint edges so wheels roll across them. A flexible sealant is for joints that need to move. They do different jobs, and we use the right one for each joint.
Ideally after the slab has done most of its shrinking, so the filler does not pull away from the edges. We set the timing based on the age of the slab, the project schedule and when the building will be occupied.
A flush joint gives forklifts and carts a smooth ride and avoids a raised bead that chips off or collects debris. It also looks cleaner on polished or coated floors.
Yes, and it is usually the best time. We repair joints, cracks and divots as part of the floor prep so the finished floor is smooth from wall to wall.
It depends on the linear footage of joints, how many edges are spalled, the number and size of cracks and divots, and whether the work happens at night or on weekends. We return a full bid within 24 hours of receiving plans, so send yours or request a site walk.
Send plans or a scope. Site walk within 1–3 business days; full bid within 24 hours of receiving plans.
Tell us about your project and we'll follow up within one business day.
Prefer to talk now? Call (214) 305-6516 or