Case Study · Distribution Warehouse · Plano, TX

Assa Abloy Warehouse: Fixing Failed Line Striping, Damaged Concrete and a Battery Charging Room

Assa Abloy engaged Legacy to restore three areas of its distribution warehouse: a main racking aisle with failing line striping, a testing area with a delaminating concrete surface, and a forklift battery charging station that required protection from acid exposure.

“I was asked to secure bids for the refurbishment of a warehouse floor, and Legacy was ultimately awarded the project. From the outset, it was clear why Legacy is regarded as a leader in its field.

Evan, in particular, was extremely professional throughout the entire process. He handled delays and other challenges with patience, professionalism, and an unwavering commitment to the successful completion of the project. His responsiveness and focus on delivering excellent customer service were particularly impressive.

Legacy is an outstanding company with a clear commitment to quality, professionalism, and, most importantly, customer success. I would not hesitate to recommend Legacy to others.”

Dave MalenfantProject Lead, Assa Abloy Warehouse Floor Refurbishment

The Project

Project Overview

Assa Abloy operates a high-volume distribution warehouse with forklift and order-picker traffic running through narrow racking aisles on every shift. Legacy was brought in to address three areas of the floor, each with a different condition.

Main racking aisle: the existing line striping had been poorly applied. It was worn, patchy and delaminating unevenly, and the crosshatched walkways no longer read clearly. Rather than restripe, Assa Abloy chose to replace the aisle with a full coating system.

Testing area: the slab had been poorly placed, and the concrete cap was delaminating, leaving a rough, damaged surface.

Battery charging station: an approximately 450 SF area along the charger wall sat on bare concrete, with no protection from battery acid drips and spills.

Before

Existing Conditions

Failing line striping in the main aisle and an unprotected concrete slab at the battery charging station.

Worn, patchy line striping in the Assa Abloy warehouse main aisle before removal
Faded crosshatched walkway striping between warehouse racks before the floor coating
Bare, stained concrete at the forklift battery chargers before the novolac floor

Preparation

Surface Preparation

Step one was removal of all existing line striping. Coating over old striping allows the lines to telegraph through the new floor and bonds the system to paint rather than concrete. The aisle was diamond ground until all striping was removed and the slab was clean and profiled.

In the testing area, the delaminating cap was ground down to sound concrete to provide a stable substrate for the new system.

The battery charging station was ground to clean, sound concrete to allow the chemical-resistant system to bond directly to the slab.

Work was phased by area, with each zone taped off during preparation and coating so warehouse operations could continue.

Diamond grinding existing line striping from the main aisle prior to coating.
Crew diamond grinding old line striping off the Assa Abloy warehouse aisle before coating

The Products

Products Installed

Main Racking Aisle

Neogard High-Traffic Urethane System

  • Neogard moisture-mitigating primer, 25 mils
  • Neogard high-traffic urethane, three-coat system
  • Color: medium gray

Urethane resists wear from forklift tires and heavy foot traffic. The moisture-mitigating primer protects the bond on a slab on grade.

Warehouse flooring

Testing Area

Same Neogard High-Traffic Urethane System

  • Neogard moisture-mitigating primer, 25 mils
  • Neogard high-traffic urethane, three-coat system
  • Color: medium gray

Removing the delaminating cap first provides a sound substrate and prevents further surface deterioration.

Moisture mitigation

Forklift Battery Charging Station · About 450 SF

Neogard Urethane Cement + Novolac Topcoat

  • Neogard urethane cement
  • Novolac topcoat

Novolac epoxy is formulated for acid and chemical exposure, keeping battery acid on the surface and out of the concrete.

Battery room flooring

Results

Completed Project

The main aisle is now a continuous medium gray floor with no striping visible beneath the surface, built for daily forklift and pedestrian traffic. The testing area has a sound, sealed surface, and the battery charging station has an acid-resistant floor that can be cleaned after a spill instead of absorbing it.

For warehouses with failing striping, deteriorating concrete or battery areas on bare concrete, Legacy can walk the facility and recommend the appropriate system for each area.

Finished photos

Finished medium gray high-traffic urethane floor in the Assa Abloy main racking aisle
Seamless urethane aisle coating between warehouse racks, taped off while curing
Acid-resistant novolac epoxy floor at the forklift battery charging wall
Finished battery charging station floor with urethane cement base and novolac topcoat

Facing similar warehouse floor conditions?

Send photos or a facility layout. Legacy will schedule a site walk and recommend the right system for each area.

Questions

Common Questions About This Project

Do you have to remove old line striping before coating a warehouse floor?

Yes. If old striping is coated over, its outline can show through the new floor and the coating ends up bonded to paint rather than concrete. On the Assa Abloy project, all existing striping was diamond ground off before coating.

What is the best floor coating for a forklift battery charging area?

Battery charging areas need a chemical-resistant system because battery acid attacks bare concrete and many standard coatings. For Assa Abloy's approximately 450 SF charging station, Legacy installed a urethane cement base with a novolac epoxy topcoat, which is built for acid and chemical exposure.

What does a moisture-mitigating primer do?

Concrete slabs can push moisture vapor up from below. Without mitigation, that vapor can cause bubbling and delamination in the coating. A moisture-mitigating primer, applied here at 25 mils, holds the vapor back so the floor system above it stays bonded.

Can you fix concrete that is flaking or scaling on the surface?

Yes. A delaminating surface is ground down to sound concrete, then a coating system is installed to seal and protect the slab.

Can a warehouse stay open while the floor is coated?

Yes. Work is phased by area, and each zone is taped off during preparation, coating and cure so the rest of the facility keeps operating.

Tell us about your floor

Send photos, a layout or drawings and we'll put together a clear plan and a firm number.

Request Information

Tell us about your project and we'll follow up within one business day.

Prefer to talk now? Call (214) 305-6516 or

PDF, images, CAD, ZIP, Word or Excel · Up to 10 files · 25 MB each