
Traffic coatings that waterproof parking decks, resist tire wear and keep the garage open while the work gets done.
A parking deck coating is a waterproof layer, not just paint. Water and road salts that get into the concrete rust the steel inside, which leads to spalls, leaks and expensive structural repairs. A good traffic coating seals the deck and stands up to turning tires.
We map the deck into standard and heavy-wear areas, repair cracks and joints first, then install the coating and new striping. Work is phased level by level, with night and weekend crews, so the garage stays open.
Legacy Industrial Coatings installs commercial and industrial epoxy flooring, polished concrete and floor coatings from Plano, Texas, across Dallas–Fort Worth, all of Texas and nationwide. See our commercial and industrial epoxy flooring and polished concrete pages.
Serving Dallas, Fort Worth, Plano, Frisco, McKinney, Richardson, Carrollton, Lewisville and the rest of North Texas, plus Houston, Austin, San Antonio and projects across Texas and nationwide.
Floors We Install Here
Vehicular traffic coatings that seal the slab against water and resist everyday tire wear.
A heavier build where tires turn, brake and wear the deck fastest.
Fast-curing coatings for entrances and spaces that need to reopen quickly.
Pedestrian deck coatings with a slip-resistant texture.
Crack repair and joint sealing done before coating so leaks do not come back.
New stall lines, arrows and markings to finish the job.


Trusted By










And more — pharmaceutical manufacturers, GCs and property managers across DFW and nationwide.
FAQ
If the deck leaks, shows cracks or has worn through to bare concrete in the drive lanes, a coating will protect the structure far better than striping alone. We can tell you which you need on the site walk.
Yes. We work level by level or section by section, coordinate signage and traffic routes with your team, and use night and weekend crews so parkers always have somewhere to go.
No. Structural problems need to be evaluated and repaired first. We flag what we see and coordinate repairs before coating, so the new coating protects sound concrete instead of hiding a problem.
Deck area, how much is heavy-wear versus standard, crack and joint repairs, striping, and the number of phases needed to keep the garage open. Send us your plans for a full bid within 24 hours, or request a site walk within 1 to 3 business days.
Send plans or a scope. Site walk within 1–3 business days; full bid within 24 hours of receiving plans.
Tell us about your project and we'll follow up within one business day.
Prefer to talk now? Call (214) 305-6516 or